![]() ![]() Location: Bridges over the Black River in the city of Black River Falls and the Union Pacific railroad tracks in the town of Brockwayĭescription: Bridges over the Black River: Overlaying both bridge decks with concrete, repairing abutment backwalls and replacing the bridge joints and concrete approach slabs. Location: Bridges over Cisna Creek west of Merrillan and Halls Creek in Merrillanĭescription: Replacing the bridge, the roadway approaches on both sides of the structures, guardrail and pavement markings. Traffic impacts: Motorists will encounter a single lane of traffic at the bridge controlled by temporary traffic signals. Location: Bridges over the Black River south of Melroseĭescription: Replacing the bridge joints and reinforcing the bridge abutments. Resurfacing east- and westbound I-94 by milling and overlaying the existing asphalt pavement from County C to the Chippewa River Bridge. Making improvements at the I-94/WIS 312/County EE interchange, including replacing the joints on the bridge, overlaying the deck with concrete and replacing the pavement on either side of the bridge and the ramps. Location: Just west of the WIS 312/County EE interchange to the Chippewa River Bridge northwest of WIS 37ĭescription: Reconstructing east- and westbound I-94 by removing and replacing the existing pavement from WIS 312/County EE to County E, replacing culverts and guardrail, installing median cable barrier, restoring the ditches and slopes and placing new pavement markings. Traffic impacts: WIS 79 is closed to through traffic, with motorists detoured via WIS 170, WIS 25 and US 12. Location: Bridges over Coon and Clack creeks between Menomonie and Boycevilleĭescription: Removing and replacing the bridges, roadway pavement on both sides of the structures, guardrail, signage and pavement markings. Traffic impacts: Motorists will encounter periodic single-lane as finishing work is completed. Location: Engdahl Road to County H north of Poplarĭescription: Removing about 2 inches of existing pavement and overlaying WIS 13 with 3.25 inches of hot mix asphalt cleaning, replacing or placing liners in culverts replacing substandard guardrail and curb and gutter where needed repairing flumes and adding new pavement markings and centerline rumble strips. ![]() Traffic impacts: Motorists will encounter daytime single-lane closures controlled by flaggers. 6 to early November (Updated)ĭescription: Removing a portion of the existing pavement and placing new asphalt pavement, adding centerline and shoulder rumble strips, adjusting guardrail, completing bridge approach work and placing new pavement markings. Location: Minnesota state line to 100 feet south of its southern intersection with WIS 35 in the village of Nelson ![]() Traffic impacts: Motorists will encounter single-lane closures, and the speed limit will be reduced to 55 mph when lanes are closed. Location: 26 th Avenue north of Rice Lake to Pine Grove Road south of Saronaĭescription: Removing the existing and base course, placing a new base aggregate layer for drainage, replacing the pavement, rebuilding intersection approaches and installing cable barrier in the median between 26 th and 27 th avenues and a friction surface on the pavement in the same area to reduce crossover crashes. Other state routes might be more advantageous depending on origination and destination.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |